A company has proposed to design a weir across a river in alluvial soil. The piezometric head at the bottom of the floor is computed as 10 m. The datum is 3 m below the floor bottom. The assured standing water depth above the floor is 2 m. The specific gravity of floor material is 2.5. The required minimum thickness of the floor is: