GATE Mechanical Engineering (ME) 2019 Shift 2 Solved Paper
© examsiri.com
Question : 38 of 65
Marks:
+1,
-0
The figure shows a pouring arrangement for casting of a metal block. Frictional losses are negligible. The acceleration due to gravity is The time (in s, round off to two decimal places) to fill up the mold cavity (of size ) is
- Your Answer:
Go to Question: