GATE Electrical Engineering (EE) 2017 Shift 2 Solved Paper

© examsiri.com
Question : 63 of 65
 
Marks: +1, -0
Two generating units rated 300 MW and 400 MW have governor speed regulation of 6% and 4% respectively from no load to full load. Both the generating units are operating in parallel to share a load of 600 MW. Assuming free governor action, the load shared by the larger unit is _________MW.
  • Your Answer:
Go to Question: