The incremental costs (in rupees/MWh) of operating two generating units are functions of their respective powers and in , and are given by
Where,
For a certain load demand, and have been chosen such that and . If the generations are rescheduled to minimize the total cost, then is___
Where,
For a certain load demand, and have been chosen such that and . If the generations are rescheduled to minimize the total cost, then is___