Question : 89 of 100
Marks:
+1,
-0
Match the items under List 1 (Components of turn out in a railway track) with those under List 2 (Details of components).
|
LIST 1 |
LIST 2 |
||
|
P. |
Stock rail |
1. |
Tapered movable rail, at its thicker end it is attached to a running rail. Also known as switch rail. |
|
Q. |
Crossing |
2. |
Pair of tongue and stock rails with necessary connections and fittings |
|
R. |
Tongue rail |
3. |
Device introduced at the junction where two rails cross each other to permit the wheel flange of a railway vehicle to pass from one track to another. |
|
S. |
Switch |
4. |
Running rail against which a tongue rail operates |