Question : 156 of 200
 
Marks: +1, -0
The following details pertain to the crossing of a canal and a drain. Bed level of Canal = + 211 m;
Full Supply depth of Canal = 1.8 m; Bed level of Drain = + 209.4 m; depth of flow at High Flood Level = + 2.2 m. The suitable type of cross drainage work is: