SSC JE Civil Engineering 25-Sep-2019 Shift 1 Solved Paper
© examsiri.com
Question : 139 of 200
Marks:
+1,
-0
A water treatment plant has a flow rate of 0.6 m/s. The settling basin at the plant has effective settling volume dimensions of length 20 m, depth 3 m, and width 6 m. What percentage of the particles having a settling velocity of 0.004 m/sec is removed?
Go to Question: