SSC JE Civil Engineering 23-Mar-2021 Shift 2 Paper
© examsiri.com
Question : 181 of 200
Marks:
+1,
-0
The following details pertain to the crossing of a canal and a natural drain.
Bed level of canal = +171 m
Full supply depth of canal = 1.6 m
Bed level of drain = +169.2 m
Depth of flow in the drain corresponding to high flood discharge = 2.5 m.
The type of cross drainage work to be designed at the crossing location is:
Bed level of canal = +171 m
Full supply depth of canal = 1.6 m
Bed level of drain = +169.2 m
Depth of flow in the drain corresponding to high flood discharge = 2.5 m.
The type of cross drainage work to be designed at the crossing location is:
Go to Question: