SSC JE Civil Engineering 23-Mar-2021 Shift 2 Paper

© examsiri.com
Question : 181 of 200
 
Marks: +1, -0
The following details pertain to the crossing of a canal and a natural drain.
Bed level of canal = +171 m
Full supply depth of canal = 1.6 m
Bed level of drain = +169.2 m
Depth of flow in the drain corresponding to high flood discharge = 2.5 m.
The type of cross drainage work to be designed at the crossing location is:
Go to Question: