SSC JE Civil Engineering 2018 Set 5 Solved Paper

© examsiri.com
Question : 118 of 200
 
Marks: +1, -0
Calculate the quantity (cubic meter) of the earthwork for a canal of 50 m long. Depths of canal at two extreme sections are 3 m and 5 m.
The bottom width and top width of the canal are 2 m and 4 m. Use midsection method.
Go to Question: