SSC CHSL Model Paper 7

© examsiri.com
Question : 29 of 100
 
Marks: +1, -0
An order was placed for supply of carpet ofbreadth 3 metres, the length of carpet was 1.44 times of breadth. Subsequently the breadth and length were increased by 25 and 40 per cent respectively. At the rate of ₹45 per square metre, what would be the increase in the cost of the carpet?
Go to Question: