IBPS PO Mains 2017 Paper for online practice

© examsiri.com
Question : 106 of 115
 
Marks: +1, -0
Moreover
A. such as wind-driven dust and unpaved roads, will be watered at least twice a day.
B. implementation of concrete mitigating measures to tackle environmental issues that arise due to the construction work on various projects
C. Any increases in the noise level that stems from the construction activity should not go higher since the project area is already a noisy environment.
D. a noise control plan should be prepared. This will ensure that equipment noise is reduced at source through proper designs and maintenance and by repairing construction machinery and equipment with the promise to ensure as far as possible that construction activity near schools would be conducted during their vacation period.
Go to Question: