GATE Mechanical Engineering (ME) 2019 Shift 1 Solved Paper
© examsiri.com
Question : 45 of 65
Marks:
+1,
-0
The variable takes a value between 0 and 10 with uniform probability distribution. The variable y takes a value between 0 and 20 with uniform probability distribution. The probability of the sum of variables being greater than 20 is
Go to Question: