GATE Electrical Engineering (EE) 2022 Solved Paper
© examsiri.com
Question : 59 of 65
Marks:
+1,
-0
Two generating units rated for 250 MW and 400 MW have governor speed regulations of 6% and 6.4%, respectively, from no load to full load. Both the generating units are operating in parallel to share a load of 500 MW. Assuming free governor action, the load shared in MW, by the 250 MW generating unit is _________. (round off to nearest integer)
- Your Answer:
Go to Question: