GATE Electrical Engineering (EE) 2015 Shift 1 Solved Paper
© examsiri.com
Question : 52 of 65
Marks:
+1,
-0
Determine the correctness or otherwise of the following Assertion (A) and the Reason (R).
Assertion (A) : Fast decoupled load flow method gives approximate load flow solution because it uses several assumptions.
Reason (R) : Accuracy depends on the power mismatch vector tolerance
Assertion (A) : Fast decoupled load flow method gives approximate load flow solution because it uses several assumptions.
Reason (R) : Accuracy depends on the power mismatch vector tolerance
Go to Question: