Question : 55 of 65
Marks:
+1,
-0
A dowel bar is placed at a contraction joint. When contraction occurs, the concrete slab cracks at predetermined location (s). Identify the arrangement, which shows the correct placement of dowel bar and the place of occurrence of the contraction crack(s).