Question : 27 of 65
 
Marks: +1, -0
In a soil investigation work at a site, Standard Penetration Test (SPT) was conducted at every 1.5m interval up to 30m depth. At 3m depth, the observed number of hammer blows for three successive 150mm penetrations were 8.6 and 9, respectively. The SPT N− value at 3m depth is