GATE Civil Engineering (CE) 2014 Shift 1 Solved Paper

© examsiri.com
Question : 63 of 65
 
Marks: +1, -0
An isolated three-phase traffic signal is designed by Webster's method. The critical flow ratios for three phases are 0.20, 0.30, and 0.25 respectively, and lost time per phase is 4 seconds. The optimum cycle length (in seconds) is ___________
  • Your Answer:
Go to Question: